Further to our previous post “Grimsby Projects – What’s Going On?”, we received another e-mail as a follow-up from the same reader. The opinions expressed in that correspondence are very enlightening, so we thought we would share them with you.
Tag: Biodigester (Page 4 of 4)
We often receive commentary and information from concerned residents who share our vision for a Greater Grimsby. The following is a very thought-provoking opinion piece we recently received from a resident and with permission decided to share with our fellow citizens.
Agenda: https://grimsby.civicweb.net/filepro/documents…
Public Works Minutes Discussion
Mr. LeRoux presented a few details of the $8M ($5M with “other projects”) Winston Road reconstruction. Costs will be covered through Development Charges (92%), outside contributions ($1.3M) and $600K from the Town. Since DC’s won’t all be received at the time construction starts this June, short term borrowing will need to be put in place with interest payments charged back to DC’s. Potential of 5-8 years to recoup the costs in a “hot” market, and up to 20 years if things slow down (highly probable). Apparently Public Works does not expect too many “extras” and has set aside a small contingency ($100K) for possible overruns.
GO Hub and Transit Station Study – Region of Niagara Presentation
The consultant is working on the draft Secondary Plan for the station area to plan the land use, infrastructure needs and transportation network. The boundary of the study area is approximately 800m (as defined by Metrolinx Mobility Hub guidelines) and includes the Livingston Road extension within the Greenbelt.